Leprino Foods – West Plant

Lemoore, CA

Emergency generators and power systems, stainless steel raceways, facility lighting and controls, fire, security and CCTV systems, energy management system, voice and data systems.

Scope highlights

  • Largest mozzarella cheese food processing facility in the world
  • 700,000 sq.ft. building for producing 1 million pounds of mozzarella cheese per day
  • 115KV high voltage substation and distribution system
  • 14 interior substations and 4 voltages (12KV, 4160v, 480v, 208v)
  • On time completion under intense 18-month schedule
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 2
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 3
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 4
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 5
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 6
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 7
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 8
Leprino Foods – West Plant in Lemoore, CA — Rex Moore electrical project photo 9

Let's build something that runs for a century.

Talk to the team about design-build electrical, low voltage systems, controls or 24/7 service.