
Emergency generators and power systems, stainless steel raceways, facility lighting and controls, fire, security and CCTV systems, energy management system, voice and data systems.
Scope highlights
- —Largest mozzarella cheese food processing facility in the world
- —700,000 sq.ft. building for producing 1 million pounds of mozzarella cheese per day
- —115KV high voltage substation and distribution system
- —14 interior substations and 4 voltages (12KV, 4160v, 480v, 208v)
- —On time completion under intense 18-month schedule








Related work
More in this market.
Let's build something that runs for a century.
Talk to the team about design-build electrical, low voltage systems, controls or 24/7 service.



